A channel, a start date and the number of weeks as well as a path for the log file are passed and the specified period is automatically scheduled.
Manual preparatory work
Slots
- In the scheme planning, a scheme for hunting (1 week) is created.
- Slots with the same name as the created program version folders are manually positioned here. The position and length of the slots are manually maintained by Planet, depending on the number and length of the programs.
Program version orders with slot names
- Creation of program version folders with slot names (Planet).
- It is important that the name of the program version folder matches the slot name exactly.
- The Waidwerk program versions are manually placed into the respective folders by Planet.
Program licenses
- Planet has a contract for the channel and corresponding licenses for all programs that are in the folders.
- The licenses require valid Windows on the Waidwerk channel.
Plan Lock
- There is no plan lock on the plan. Therefore, the plan must not be in progress.
Sequence
Scheduling can be performed via the "Auto Scheduling" tab in the details pane or via "Automatic Scheduling" in JobCtrl. The "Auto Scheduling" report is displayed in the output window in the details pane; alternatively, additional information can be found in the log file.